ARM Group Inc.
ARM Group Inc.
ARM Group Inc.
ARM Group Inc.
Our Services

Waste Management

Managing waste in concert with natural resources becomes increasingly difficult as existing disposal facilities approach capacity and available land resources diminish. ARM's engineers and scientists have successfully addressed waste disposal issues involving solid and hazardous waste disposal for over 25 years. We work closely with municipalities, industries, and waste authorities to incorporate emerging technologies with established practices to maximize site efficiency, minimize waste generation, and remediate impacted areas.

LCSWMA's Frey Farm Borrow Project Takes Shape
In February 2011, the Lancaster County Solid Waste Management Authority (LCSWMA) began construction on the Frey Farm Landfill (FFLF) Parcels 4 and 5 Soil Borrow Project. Read More

Chester County Solid Waste Authority Embarks on First Stage of Multi-Year Area E Expansion Construction Project
Chester County Solid Waste Authority (CCSWA) awarded the first construction contract for its multi-stage, multi-year construction project to expand the Lanchester Landfill. The landfill expansion project, known as "Area E," will include various site preparation activities and infrastructure upgrades to enable the landfill to be expanded. The initial build-out will require three separate stages of construction, taking place over approximately three years, and will involve:

  • Construction of sedimentation pond expansions and storm water facilities (Stage 1A) during the 2011 and 2012 construction seasons.
  • Modification of leachate, landfill gas, and electrical infrastructure (Stage 1B), to be performed concurrently with Stage 1A activities, during the 2012 construction season.
  • Preparatory grading for the mechanically stabilized earth (MSE) berm and Area E Landfill Cell 1 (Stage 1B).
  • Relocation of approximately 40,000 cubic yards of waste and cover soil from the unlined Mountain Top Landfill into the active, double-lined Area D Landfill (Stage 1B).
  • Construction of the first phase of MSE berm and the new landfill cell expansion of approximately 17.8 acres (Stage 2).

Stage 1A got underway this fall (2011) and will continue until part way through 2012. The CCSWA plans to have expansion capacity by completing Stage 2 of Area E Construction at the beginning of 2014, followed by incremental build-outs of the remainder of the expansion through 2023.

ARM Group Inc. (ARM) was retained by CCSWA to provide engineering services to permit the Area E Expansion through the Pennsylvania Department of Environmental Protection (PADEP), and to provide final engineering design services for bidding and construction-phase engineering.

Site Investigations, Permitting and Compliance Support
ARM has expanded its capabilities to perform Pennsylvania Solid Waste Permitting Form D Assessments with new and more extensive Ecological Services. To learn more about ARM's Ecological Services, please Click Here

Waste Disposal Facilities Engineering
  • Liner System Analysis and Selection
    • Geosynthetic
    • Composite
    • Clay
    • Attenuating Base
    • Inward Gradient
  • Cap/Alternative Cover System Design
    • Geosynthetic
    • Earthen
    • Evapo-Transpiration (ET)
    • Capillary Break
    • Phyto/Vegetative
  • Leachate Management, Recirculation, and Bioreactor Design and Monitoring
  • Gas Management
  • Closure/Post-Closure Plans
  • Airspace Recovery/Enhancement:
    • Piggybacking/Overfill Design
    • MSE Berms
    • Mining, Pre-Loading
  • Construction Quality Assurance Inspection and Testing
Remedial System Application and Design
  • Contaminant Mapping
  • Phytoremediation
  • Reactive Wall Systems
  • Slurry/Containment Walls


Order Services | Terms & Conditions | Client Survey | Employee Mail | FTP Access   
1129 West Governor Road, P.O. Box 797, Hershey, PA 17033-0797 (View Our Locations)
Phone: (717) 533-8600 - Email: info@armgroup.net

© 2010, ARM Group Inc. - All Rights Reserved.
This site's web design and hosting provided by EZSolution Corp., Lancaster, PA.