CCSWA won a SWANA Landfill Management Silver Excelleance Award for its use of piggy-backing and public outreach associated with
this project.

Read Award Letter From SWANA to CCSWA.

 

Chester County Solid Waste Authority


Early Construction of MSE Wall
Lanchester Landfill Area D Expansion

Chester County, PA

Landfill Expansion Permitting, Design & Construction Phase Engineering

Client: Chester County Solid Waste Authority

ARM is providing comprehensive waste management engineering services to Chester County Solid Waste Authority (CCSWA) for the Area D Expansion at CCSWA's Lanchester Landfill. Because CCSWA had little available space to expand its landfill laterally, ARM developed a solution that provided the needed capacity through vertical expansion. This design combines: 1) piggybacking of new disposal space over the existing landfill; and 2) construction of a Mechanically Stabilized Earth (MSE) wall along the northern permit boundary. Through the construction of the 40-foot high MSE wall, waste thickness can be significantly increased along 3,000 feet of the northern boundary, which would not have been achieved using conventional landfill grading.

The 3,000-foot long MSE wall is designed with a 63.5-degree sloped front face. The front face is stepped with welded wire mesh forms and geogrid reinforcing elements are utilized for primary stabilization of the wall.

This expansion provides CCSWA with an additional net waste disposal capacity of approximately two million tons.


Conceptual drawing showing piggybacking.
The green represents part of the existing landfill
and blue represents the expansion.
ARM also designed other critical components of the landfill, including an active landfill gas collection system and a leachate recirculation system. Leachate recirculation will be used to enhance biodegradation and waste settlement resulting in increased air space and decreased post-closure settlement.

As part of the permitting process for this expansion, ARM prepared a comprehensive harms/benefits analysis for the Project, including a line-of-sight study, using a method developed by ARM and approved by PADEP.

ARM provided final design and construction-phase engineering services during Stage 1 construction, which was completed in 2005, and for Stages 2 and 3 construction, which were completed in 2006.

If you would like additional information about this project or any of ARM's projects or services please send an e-mail to info@armgroup.net.

View Additional Projects

Order Services | Terms & Conditions | Client Survey | Employee Mail | FTP Access   
1129 West Governor Road, PO Box 797, Hershey, PA 17033-0797 (View Our Locations)
Phone: (717) 533-8600 - Email: info@armgroup.net

© , ARM Group Inc.. All Rights Reserved.
This site's web design and hosting provided by EZSolution Corp., Lancaster, PA.